T-Mobile 4G → 5G DAS Upgrade (Six Campus Buildings)
Coordinated network infrastructure delivery for a carrier 4G → 5G DAS upgrade across six campus buildings — rack, power, pathway readiness, access, and vendor scheduling.
Use the filters and search to explore projects across infrastructure, Agile delivery, automation, dashboards, low-code, software, innovation, and community.
All visuals are sanitized, anonymized, or recreated with mock data. No confidential employer, vendor, infrastructure, ticket, IP, or internal system data is published.
Coordinated network infrastructure delivery for a carrier 4G → 5G DAS upgrade across six campus buildings — rack, power, pathway readiness, access, and vendor scheduling.
Coordinated RFID deployment: reader placement, cabling, network integration, and go-live support.
Rollout of TCP time-clock devices: network drops, PoE planning, device provisioning, and cutover coordination.
Earlier network room build support listed separately from the NCR Build below — distinct scope pending confirmation. Rack layout, fiber/copper backbone, and power coordination.
Coordinated NCR build: rack elevations, PDU/iPDU power planning, equipment placement, fiber/copper pathways, and dependencies across engineering, facilities, and vendors.
Network readiness, placement planning, vendor scheduling, access, and install tracking for network-connected environmental sensors.
Network delivery inside renovations — outlets, APs, card readers, AV, pathways, and change-window coordination.
Review roughly 5–10 construction document sets per month for network impact — outlets, APs, telecom rooms, pathways, demolition risk.
Maintain and organize a backlog of roughly 3,000–4,000 ADO items: hierarchy, acceptance criteria, hygiene standards, and dashboards.
Structured epics, features, and PI objectives so infrastructure delivery aligns with program-level priorities.
Built and tested flow for ~550 vendor notices/yr. 21-run audit: 17 succeeded, 4 failed — production hardening in progress.
Project tracking workbook with work-item IDs, notifications, activity logs, and dashboards.
Excel/SharePoint-backed interim inventory with RFQ line-item IDs and low-stock alerts (<5); Power Apps build underway.
Internal ticket tracking app with add, edit, delete, filtering, assignment, and reporting.
Visual tool for mapping data outlets, patch panels, and switch ports for renovation planning.
Dashboard concept for asset levels, equipment movement, and infrastructure reporting.
Tool concept to accelerate CD review for network components — outlet counts, telecom room impact, demolition risk.
Tool concept for measuring and marking floor plan areas during infrastructure planning.
Completed MSIT capstone prototype: explainable, human-reviewed incident priority scoring with mock data. Not a production ML tool.
Desktop sales application concept with POS, inventory, receipts, and reports.
Website concept for a Christ-centered children's ministry in Ethiopia.
Business website for real estate media services and visual portfolio.